High School Building work is going well

SAM_3919 The building work at the High School started in March and is now well underway. You can see pictures in the photo gallery. The first classroom block is being built (8 classrooms). The laboratory block will have 4 labs: Chemistry, Physics, Biology and Information Technology.IMG_0934SAM_3416 sm

 

This entry was posted in Blog. Bookmark the permalink.